Skip to content
YpsiDatacenter.org YpsiDatacenter.org

Up-to-date information on the proposed University of Michigan / Los Alamos Datacenter Project

YpsiDatacenter.org YpsiDatacenter.org

Up-to-date information on the proposed University of Michigan / Los Alamos Datacenter Project

  • Home
  • Resources
    • About YpsiDatacenter.org
    • What Is a Data Center?
    • Project Timeline
    • Who’s Who
    • What They Said, and What the Record Shows
    • How Loud Is a Data Center?
    • How Much Water Does a Data Center Use?
    • Why We Oppose This Project
    • Why the Township Can’t Zone This — and Won’t Tax It
    • Responsible Opposition
    • The Nuclear Question
    • In the News
    • Sources & Links
  • Community Toolkit
    • Data Center Database
  • Take Action
    • Legislation
      • Bills We are Tracking
      • Contact Your Representatives
    • Sign Up for Updates
    • Contact Your Representatives
    • Our FOIA Guide Has Moved — and Grown
    • FOIA Center
    • Request a Yard Sign
    • Events
    • How to Use Your Ninety Seconds
    • Volunteer
  • Policies
    • Terms & Acceptable Use
    • Privacy Policy
  • News
  • Home
  • Resources
    • About YpsiDatacenter.org
    • What Is a Data Center?
    • Project Timeline
    • Who’s Who
    • What They Said, and What the Record Shows
    • How Loud Is a Data Center?
    • How Much Water Does a Data Center Use?
    • Why We Oppose This Project
    • Why the Township Can’t Zone This — and Won’t Tax It
    • Responsible Opposition
    • The Nuclear Question
    • In the News
    • Sources & Links
  • Community Toolkit
    • Data Center Database
  • Take Action
    • Legislation
      • Bills We are Tracking
      • Contact Your Representatives
    • Sign Up for Updates
    • Contact Your Representatives
    • Our FOIA Guide Has Moved — and Grown
    • FOIA Center
    • Request a Yard Sign
    • Events
    • How to Use Your Ninety Seconds
    • Volunteer
  • Policies
    • Terms & Acceptable Use
    • Privacy Policy
  • News
Close

Search

Subscribe

How Data Centers Stay Cool: Cooling Technologies and Their Trade-offs

The short version

Almost all the electricity a data center uses ends up as heat, and getting rid of that heat drives many of the things neighbors care about most: water use, wastewater, constant fan noise and extra demand on the power grid. Every cooling technology handles that heat differently, and every one of them trades something away. There’s no option that’s free on water, power, noise and chemicals all at once.

That’s why “we’ll use advanced cooling” isn’t an answer. This page walks through the main technologies, the numbers you’ll see in a proposal, and the questions that pin down what a specific facility will actually do.

I’m not an engineer. This page is drawn from federal research, the industry’s own metric definitions and published reporting, all linked below.

Two numbers to know

  • PUE — Power Usage Effectiveness. The facility’s total electricity divided by the electricity used by the computers themselves. A PUE of 1.0 would mean no energy went to cooling or anything else; the Department of Energy’s Federal Energy Management Program says an average data center is around 2.0, while highly efficient ones approach 1.0. (DOE FEMP)
  • WUE — Water Usage Effectiveness. Liters of water used on site per kilowatt-hour of computing. It was defined by an industry group, The Green Grid, and is now an international standard (ISO/IEC 30134-9). The national average site WUE was just over 0.36 liters per kWh in 2023, and is projected to rise to 0.45–0.48 as larger and AI-focused facilities grow. (Lawrence Berkeley National Laboratory, 2024)

The catch: these two numbers pull against each other. Using water to cool is usually more energy efficient, so a low PUE can come with a high WUE, and vice versa. A proposal that brags about one and doesn’t mention the other is telling you half the story.

Direct and indirect water

The most authoritative recent study, Lawrence Berkeley National Laboratory’s 2024 United States Data Center Energy Usage Report to Congress, estimated that U.S. data centers consumed about 17 billion gallons of water directly for cooling in 2023 — and could double or quadruple that by 2028. (summary) It also estimated about 211 billion gallons consumed indirectly, at the power plants generating their electricity — roughly 12 times the direct use. (Civil Beat)

Two things follow. First, a company’s water figures usually cover only on-site cooling, so they leave out the larger indirect share. Second, the indirect water is drawn from wherever the power is generated, while the direct water comes out of your local system or aquifer, so the direct number is the one that matters most to a host community.

The main cooling technologies

Most large facilities combine several of these, switching between them by season. The first group cools the air inside the building; the second group gets the heat out of the building.

TechnologyHow it worksWaterElectricityNoise and other concerns
Air-side economizer (“free cooling”)Filtered outside air cools the servers directly when it’s cool and dry enoughVery lowLowDepends on climate; needs backup for hot or humid days. Large air intakes and fans.
Direct evaporative or adiabatic coolingOutside air is drawn through water-soaked pads, cooling it as the water evaporatesHigh in hot weatherLowAmazon describes this as its primary method, used during peak summer temperatures alongside free-air cooling. (SlashGear)
Water-cooled chillers with cooling towersChillers make cold water for the building; towers outdoors reject heat by evaporating waterHigh: evaporation plus “blowdown” wastewaterLow to moderateBlowdown carries concentrated minerals and treatment chemicals. Tower fans and plumes.
Air-cooled chillersChillers reject heat to outside air with fans and compressors, using no evaporationNear zero on siteHighest, especially in hot weatherLarge fan arrays — often a major source of constant noise. Refrigerants.
Dry coolers and adiabatic or hybrid coolersRadiator-like coils with fans; hybrid versions spray water only on the hottest daysZero (dry) to low (hybrid)ModerateFan noise. In dry climates, adiabatic and hybrid systems can use 90% to 95% less water than an evaporative tower. (Utility Dive) Glycol in outdoor loops.
Direct-to-chip liquid coolingCoolant runs through cold plates attached directly to processors in a closed loopNone inside the building — but see belowEfficientStill needs outdoor heat rejection. Coolant leaks; glycol.
Single-phase immersionServers are submerged in a nonconductive fluid, such as mineral oil or synthetic oil, that circulates to a heat exchangerNone inside — but see belowEfficientLarge volumes of fluid to store, handle and dispose of.
Two-phase immersionServers are submerged in a fluid that boils off the hot chips and condenses backNone inside — but see belowMost efficientThe fluids have mostly been fluorinated chemicals, including PFAS. See below.

“Liquid cooling” doesn’t make the heat disappear

This is the point most worth remembering. Liquid cooling moves heat away from the chips far better than air, which is why AI facilities are adopting it. But the heat still has to leave the building. The Department of Energy’s own diagram of a liquid-cooled data center shows the heat moving from the racks through a closed loop and then on to a cooling tower. (DOE FEMP) If that outdoor equipment is an evaporative tower, the facility still consumes water. If it’s air-cooled chillers or dry coolers, it uses more electricity and runs large banks of fans.

So when a developer says “closed-loop” or “liquid-cooled,” the follow-up question is always: what’s outside the building, rejecting the heat? Microsoft’s “zero water evaporated” design is a good example of the honest version: it uses a closed loop to the chips and sends that heat to chillers rather than evaporative towers. (GeekWire) That saves water, but by most accounts uses more electricity than evaporative cooling would.

The water-energy trade-off

Going “waterless” isn’t free. One industry analysis estimates that switching a 100-megawatt data center from water-cooled to air-cooled chillers could add more than 10,000 kilowatts of electrical demand. (Utility Dive) That extra power has its own costs: more generation, more grid upgrades, and more of the indirect water used at power plants.

Researchers studying this trade-off conclude that judging dry cooling by water volume alone can be misleading, and that it makes the most sense where its energy penalty is small. (“Balancing Bits and Drops,” 2026) Climate matters a lot here. A site in a cool climate can use outside air for much of the year and needs mechanical cooling less often; a hot, humid site leans on evaporation or compressors.

The right answer depends on where the water comes from, how stressed it is, where the power comes from, and who lives next to the fans. That’s why the questions below matter more than any single technology.

Wastewater and chemicals

  • Cooling tower blowdown. As water evaporates in a tower, minerals stay behind and concentrate, so some water has to be drained off and replaced. That drained water — blowdown — carries concentrated minerals and the chemicals used to control scale, corrosion and bacteria. Where it goes, and how it’s treated, matters: to the sewer, to a treatment plant, or under a discharge permit to a river.
  • “Cycles of concentration.” How many times water is reused before it’s drained. The Department of Energy notes that two to four cycles are common and that raising cycles from three to six can cut make-up water by about 20% and blowdown by about 50%. (DOE FEMP) Higher cycles mean less water — and more concentrated discharge.
  • Glycol. Many closed loops, especially outdoor ones, use a glycol-and-water mixture for freeze protection. Leaks and disposal need a plan.
  • Refrigerants. Chillers use refrigerants, which are potent greenhouse gases if they leak and are being phased down under federal law.
  • PFAS in two-phase immersion fluids. The fluids long used for two-phase immersion, such as 3M’s Novec, are fluorinated chemicals in the PFAS family, often called “forever chemicals” because they persist in water and soil. (DatacenterDynamics) 3M announced in December 2022 that it would exit PFAS manufacturing by the end of 2025, and newer fluorinated fluids proposed as replacements are drawing scrutiny of their own — WRAL has reported on one, Chemours’ Opteon 2P50, pending EPA review. (summary of WRAL’s report) If a proposal mentions immersion cooling, ask which fluid, and whether it’s a PFAS.

Cooling and noise

The equipment that rejects heat outdoors — chiller and dry-cooler fan arrays, cooling tower fans and rooftop units — is often the source of the constant, low-pitched hum neighbors complain about. Designs that save water by relying on air-cooled equipment can mean more fans running more of the time. Cooling choices and noise should be reviewed together. See Environmental Noise.

Questions to ask about any proposal

  1. What cooling system will the building use inside, and what equipment will reject the heat outdoors?
  2. What is the projected water use on an average day and on the hottest day of the year, and what’s the design WUE?
  3. Where will the water come from — a municipal system, private wells, or reclaimed water — and has the water utility confirmed in writing that it has the capacity?
  4. Will there be cooling tower blowdown or other wastewater? How much, what will it contain, and where will it be discharged?
  5. What is the design PUE, and how much additional electricity will cooling require on the hottest day?
  6. What chemicals, glycol, refrigerants or immersion fluids will be used and stored on site? Are any of them PFAS?
  7. How loud will the outdoor cooling equipment be at the nearest homes, day and night?
  8. Will the company commit to these numbers in a binding agreement, and report actual water and energy use each year?

Example: what to ask in Ypsilanti Township

For the proposed Textile Road facility, the University hasn’t published the answers to most of these questions. The site sits on the Huron River, upstream of Ford Lake, so where any cooling wastewater would go matters as much as how much water the facility would draw. And with homes nearby, the noise from outdoor cooling equipment deserves the same scrutiny as the water. These are the questions we’re asking.


Sources and further reading

  • Arman Shehabi et al., Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report, December 2024.
  • U.S. Department of Energy, Federal Energy Management Program, Cooling Water Efficiency Opportunities for Federal Data Centers.
  • The Green Grid, Water Usage Effectiveness (WUE): A Green Grid Data Center Sustainability Metric, White Paper 35.
  • Utility Dive, analysis of the water-energy trade-off in data center cooling, including adiabatic and hybrid systems.
  • “Balancing Bits and Drops: Stress-Adjusted Water Management for Data Centers,” arXiv, 2026.
  • “Data centers consume massive amounts of water — companies rarely say exactly how much,” Civil Beat, August 2025.
  • “Microsoft shares new data center design featuring a closed-loop water system for cooling,” GeekWire, 2024.
  • “Coolant shortage will hit chips and data centers after pollution closes 3M factory in Belgium,” DatacenterDynamics.
  • On Chemours’ Opteon 2P50 and North Carolina data centers: summary of WRAL’s reporting.
Start Here
What is a Data Center?
Just the Facts
Project Links
Who's Who

Recent Posts

  • The Letter That Spoke for Ypsilanti Township
  • Not Yet: What the Regents Are Being Asked to Approve Thursday
  • “LANL Has Made No Commitment of Funds”
  • Four Years of Regents Minutes
  • How the Words Changed

Archives

  • November 2026
  • October 2026
  • September 2026
  • August 2026

Categories

  • Documents & Records
  • Legislation & Advocacy
  • Public Meetings
  • Responses
  • Uncategorized

Privacy Policy • Terms & Acceptable Use

Copyright 2026 — YpsiDatacenter.org. All rights reserved.

Get action alerts

One small, specific task at a time — a call or an email that takes five minutes. Unsubscribe anytime.