Skip to content
YpsiDatacenter.org YpsiDatacenter.org

Up-to-date information on the proposed University of Michigan / Los Alamos Datacenter Project

YpsiDatacenter.org YpsiDatacenter.org

Up-to-date information on the proposed University of Michigan / Los Alamos Datacenter Project

  • Home
  • Resources
    • About YpsiDatacenter.org
    • What Is a Data Center?
    • Project Timeline
    • Who’s Who
    • What They Said, and What the Record Shows
    • How Loud Is a Data Center?
    • How Much Water Does a Data Center Use?
    • Why We Oppose This Project
    • Why the Township Can’t Zone This — and Won’t Tax It
    • Responsible Opposition
    • The Nuclear Question
    • In the News
    • Sources & Links
  • Community Toolkit
    • Data Center Database
  • Take Action
    • Legislation
      • Bills We are Tracking
      • Contact Your Representatives
    • Sign Up for Updates
    • Contact Your Representatives
    • Our FOIA Guide Has Moved — and Grown
    • FOIA Center
    • Request a Yard Sign
    • Events
    • How to Use Your Ninety Seconds
    • Volunteer
  • Policies
    • Terms & Acceptable Use
    • Privacy Policy
  • News
  • Home
  • Resources
    • About YpsiDatacenter.org
    • What Is a Data Center?
    • Project Timeline
    • Who’s Who
    • What They Said, and What the Record Shows
    • How Loud Is a Data Center?
    • How Much Water Does a Data Center Use?
    • Why We Oppose This Project
    • Why the Township Can’t Zone This — and Won’t Tax It
    • Responsible Opposition
    • The Nuclear Question
    • In the News
    • Sources & Links
  • Community Toolkit
    • Data Center Database
  • Take Action
    • Legislation
      • Bills We are Tracking
      • Contact Your Representatives
    • Sign Up for Updates
    • Contact Your Representatives
    • Our FOIA Guide Has Moved — and Grown
    • FOIA Center
    • Request a Yard Sign
    • Events
    • How to Use Your Ninety Seconds
    • Volunteer
  • Policies
    • Terms & Acceptable Use
    • Privacy Policy
  • News
Close

Search

Subscribe

What Is a Battery Energy Storage System (BESS)?

The short version

A battery energy storage system — usually called a BESS — is a very large rechargeable battery connected to the power grid. It charges when electricity is plentiful or cheap and discharges when it’s needed. Most look like rows of shipping containers or large metal cabinets on a gravel pad, surrounded by fencing, with cooling equipment, inverters and transformers alongside.

BESS sites are being built quickly across the country. They can help the grid, and they can be built safely, but they carry a real fire risk that deserves serious attention when one is proposed near homes.

Why they’re being built

  • Balancing the grid. Solar and wind produce power when the sun shines and the wind blows, not necessarily when people need it. Batteries store that power for later.
  • Meeting peak demand. Batteries can supply power during the few hours a year when demand is highest, instead of running extra power plants.
  • Serving large customers. Data centers and factories sometimes pair with batteries for backup power or to reduce what they draw from the grid at peak times.
  • State policy. Michigan’s 2023 clean energy laws set a goal of 50% renewable energy by 2030, and storage is part of meeting it.

Megawatts and megawatt-hours

Battery sites are described with two numbers, and the difference matters.

  • Megawatts (MW) — how much power the site can deliver at once. Think of it as how wide the faucet opens.
  • Megawatt-hours (MWh) — how much energy it stores in total. Think of it as how big the tank is.

A “50 MW / 200 MWh” site can deliver 50 megawatts for four hours. When you hear one number, ask for the other. The megawatt-hours tell you how much stored energy — and fuel for a fire — is sitting on the site.

The fire risk, honestly

Most BESS sites use lithium-ion batteries — the same basic technology as your phone, scaled up enormously. Their main hazard is thermal runaway: a damaged or defective cell overheats, triggers a chemical reaction that makes more heat, and can spread to neighboring cells. Once it gets going, it can produce fire, explosions and toxic gases, and it’s extremely hard to put out with water. Fire departments now generally let these fires burn out while protecting the surroundings.

The best-known example is the fire at Vistra’s Moss Landing facility in California on January 16, 2025. It burned most of a 300 MW / 1,200 MWh battery installation housed inside a former power plant building, led to evacuation orders for about 1,200 residents, and smoldered for days. It was the facility’s third serious incident.12

It’s also important to know what made Moss Landing different from many newer projects:

  • It was designed before the national fire standard. The National Fire Protection Association’s standard for energy storage systems, NFPA 855, was first published for 2020 and updated in 2023. Moss Landing’s design was accepted before it applied.23
  • Its battery chemistry was more fire-prone. It used “NMC” (nickel manganese cobalt) cells. Most new projects use “LFP” (lithium iron phosphate), which is considered more stable — though not immune to fire.3
  • The batteries were packed inside one building. Many newer sites use separate outdoor containers spaced apart, so a fire in one unit is less likely to spread to others.

So the honest answer isn’t “batteries are safe” or “batteries will explode.” It’s that the risk depends heavily on the chemistry, the layout, the standards it’s built to, how far it sits from homes, and whether your local fire department is trained and equipped for it. Those are exactly the things to ask about.

Other concerns

  • Toxic smoke and runoff. Battery fires release gases such as hydrogen fluoride, and water used on a fire can carry contaminants off the site unless there’s containment.
  • Noise. Cooling systems, inverters and transformers hum and whir, often around the clock.
  • Decommissioning. Batteries wear out in roughly 15 to 20 years. Someone has to remove and recycle them, and a bond or other financial guarantee makes sure it isn’t the township.

Who decides

Smaller battery sites are usually decided through ordinary local zoning. For large ones, it depends on your state: some states let a state agency approve big energy projects in place of — or over the objection of — local government, and the rules have been changing quickly. Check your state resource page before a project arrives.

Michigan is a good example of how this works. Public Act 233 of 2023, signed November 28, 2023, lets developers of large energy projects ask the Michigan Public Service Commission (MPSC) for a siting certificate instead of local zoning approval. For battery storage, it covers sites of 50 MW or more with at least 200 MWh of storage.4

A developer can go to the MPSC if a community doesn’t have a “compatible renewable energy ordinance” — local rules no more restrictive than the state’s standards — or if the community has a moratorium, doesn’t decide in time, or denies a project that meets the state standards.5

What this means for your community: in Michigan, for a large battery project, your township’s ordinance may determine whether the decision stays local, while smaller sites below those thresholds remain under ordinary local zoning. (More in our Michigan energy and data center laws guide.) Wherever you live, it’s worth finding out whether your state has a law like this, and whether your local ordinance needs updating — now, not after an application arrives.

Good first questions to ask

  1. How many megawatts, and how many megawatt-hours?
  2. What battery chemistry will it use — LFP, NMC or something else?
  3. Which edition of NFPA 855 will it be built to? Will the developer share its fire-testing results (called UL 9540A) and its hazard mitigation analysis?
  4. Has our fire department reviewed the emergency response plan, and will it be trained and equipped before the site opens?
  5. How far will the batteries be from homes, schools and wells?
  6. How will firefighting water be contained so it doesn’t reach ditches, wells or streams?
  7. How loud will it be at the property line, day and night?
  8. Who pays for removal at the end of its life, and is there a bond to guarantee it?
  9. Is the developer planning to seek state approval instead of local approval? (In Michigan, that would be MPSC approval under PA 233.)

Sources

  1. “Vistra battery blaze in California sparks broader technology concern,” S&P Global Market Intelligence, January 2025.
  2. Western Electricity Coordinating Council, Moss Landing BESS fire report presentation, April 21, 2026.
  3. Industrial Info Resources, “Fire at Vistra’s Moss Landing BESS Facility Under Control,” January 21, 2025; and Ava Community Energy, “Battery fires prompt new push for safety.”
  4. Michigan Public Service Commission, Renewable Energy and Storage Facility Siting — General FAQs; Public Act 233 of 2023 (House Bill 5120), enacted text.
  5. Michigan Public Service Commission, Renewable Energy and Energy Storage Facility Siting Workgroup. See also the University of Michigan Graham Sustainability Institute’s plain-language guide for local governments, Michigan energy siting.
Start Here
What is a Data Center?
Just the Facts
Project Links
Who's Who

Recent Posts

  • The Letter That Spoke for Ypsilanti Township
  • Not Yet: What the Regents Are Being Asked to Approve Thursday
  • “LANL Has Made No Commitment of Funds”
  • Four Years of Regents Minutes
  • How the Words Changed

Archives

  • November 2026
  • October 2026
  • September 2026
  • August 2026

Categories

  • Documents & Records
  • Legislation & Advocacy
  • Public Meetings
  • Responses
  • Uncategorized

Privacy Policy • Terms & Acceptable Use

Copyright 2026 — YpsiDatacenter.org. All rights reserved.

Get action alerts

One small, specific task at a time — a call or an email that takes five minutes. Unsubscribe anytime.