    • What Is a Data Center?
    • Project Timeline
    • Who’s Who
    • What They Said, and What the Record Shows
    • How Loud Is a Data Center?
    • How Much Water Does a Data Center Use?
    • Why We Oppose This Project
    • Why the Township Can’t Zone This — and Won’t Tax It
    • Responsible Opposition
    • The Nuclear Question
    • In the News
    • Sources & Links
  • Community Toolkit
    • Data Center Database
  • Take Action
    • Legislation
      • Bills We are Tracking
      • Contact Your Representatives
    • Sign Up for Updates
    • Contact Your Representatives
    • Our FOIA Guide Has Moved — and Grown
    • FOIA Center
    • Request a Yard Sign
    • Events
    • How to Use Your Ninety Seconds
    • Volunteer
  • Policies
    • Terms & Acceptable Use
    • Privacy Policy
  • News
  • Home
  • Resources
    • About YpsiDatacenter.org
    • What Is a Data Center?
    • Project Timeline
    • Who’s Who
    • What They Said, and What the Record Shows
    • How Loud Is a Data Center?
    • How Much Water Does a Data Center Use?
    • Why We Oppose This Project
    • Why the Township Can’t Zone This — and Won’t Tax It
    • Responsible Opposition
    • The Nuclear Question
    • In the News
    • Sources & Links
  • Community Toolkit
    • Data Center Database
  • Take Action
    • Legislation
      • Bills We are Tracking
      • Contact Your Representatives
    • Sign Up for Updates
    • Contact Your Representatives
    • Our FOIA Guide Has Moved — and Grown
    • FOIA Center
    • Request a Yard Sign
    • Events
    • How to Use Your Ninety Seconds
    • Volunteer
  • Policies
    • Terms & Acceptable Use
    • Privacy Policy
  • News
Close

Search

Subscribe

What Is a Data Center?

The short version

A data center is a building full of computers. That’s really it. Every time you send an email, stream a show, store a photo in “the cloud,” or ask an AI chatbot a question, a computer in a data center somewhere does the work.

What makes data centers a community issue isn’t the computers. It’s what it takes to keep thousands of them running 24 hours a day, every day: enormous amounts of electricity, a way to get rid of the heat they make, backup power for when the grid fails, and in many cases a lot of water.

What’s inside

I work on this equipment for a living, so let me walk you through it the way I’d explain it to a neighbor.

  • Servers. Computers without screens or keyboards, stacked in tall metal cabinets called racks. A large facility can hold tens of thousands of them. Servers built for artificial intelligence pack far more processing — and use far more power — into the same space.
  • Power equipment. High-voltage lines feed an on-site or nearby substation, which steps the voltage down. Inside, the power runs through switchgear, transformers and large banks of batteries (called UPS, for “uninterruptible power supply”) that keep the servers running for the seconds or minutes it takes backup power to start.
  • Backup generators. Usually rows of large diesel or natural-gas generators, sized to run the whole facility if the grid goes down. They’re tested regularly, often monthly, and those tests are one source of noise and air emissions.
  • Cooling. Nearly every watt of electricity a server uses turns into heat, and that heat has to go somewhere. Some facilities blow air across the servers and reject the heat through rooftop or ground-level chillers and fans. Some use evaporative cooling, which consumes water. Newer AI facilities often pipe liquid directly to the chips in a closed loop, which can use less water but still needs large outdoor equipment to shed the heat.
  • Network connections. Bundles of fiber-optic cable connecting the building to the rest of the internet.

Not all data centers are the same

“Data center” covers everything from a server room in a hospital basement to a campus the size of several shopping malls. Knowing which kind you’re dealing with tells you a lot.

TypeWho runs itTypical size
EnterpriseOne company, hospital or university, for its own useSmall to medium
Colocation (“colo”)A landlord that rents space, power and cooling to many tenantsMedium to large
HyperscaleVery large tech companies (Google, Amazon, Microsoft, Meta) for their own cloud servicesVery large, often multi-building campuses
AI or high-performance computing (HPC)Tech companies, research institutions or government labs, for training AI models or running scientific and defense simulationsRanges widely; the newest are among the most power-hungry buildings ever built

How big is big?

Data centers are usually described by how much electricity they can draw, measured in megawatts (MW), not by square feet. That’s the number to ask for first.

To put a megawatt in perspective: a facility drawing 100 MW around the clock uses about 876,000 megawatt-hours a year. The average American home uses roughly 10,000 to 11,000 kilowatt-hours a year, so a 100 MW data center uses about as much electricity as 80,000 or so homes. New hyperscale and AI campuses are being proposed at 500 MW, 1,000 MW and more.

Nationally, the growth is steep. A 2024 report from Lawrence Berkeley National Laboratory, written for the U.S. Department of Energy, found that data centers used about 4.4% of all U.S. electricity in 2023 and could use 6.7% to 12% by 2028 — rising from 176 terawatt-hours to somewhere between 325 and 580. The same report estimated data center water consumption grew from about 21 billion liters in 2014 to 66 billion in 2023, mostly at hyperscale sites.1

What a data center needs from a community

  • Land — often large, flat parcels, sometimes former industrial or farm land.
  • Power — a connection to high-voltage transmission lines, frequently a new substation, and sometimes new power plants or transmission lines built partly because of the demand.
  • Water — for cooling, depending on the design. This varies enormously, from very little to millions of gallons a day.
  • Zoning and permits — local approvals, plus state permits for things like generator air emissions, stormwater and wetlands.
  • Tax treatment — data centers commonly seek tax abatements, exemptions or state grants.

Jobs

Data centers create a lot of construction work for a year or two. Once they’re running, they need surprisingly few people — a large facility might employ a few dozen to a few hundred, because the computers mostly run themselves. When you see a jobs number, ask whether it’s construction jobs or permanent jobs, and whether it’s a promise in a signed agreement or an estimate in a press release.

State incentives

Many states compete for data centers with tax breaks, most often sales and use tax exemptions on the servers and equipment inside. Across the Great Lakes region, Indiana and Ohio both offer sales tax exemptions; Minnesota’s 2025 data center law modified its exemptions and added annual fees for large facilities; and Illinois paused new data center incentive agreements in 2026 while it studies reforms. The details — and the conditions attached — are on each state resource page. When a project is announced, ask what incentives it’s receiving and what it has to deliver in return.

Michigan is one example. The state began actively courting large data centers in 2024–25. On January 17, 2025, the Governor signed House Bill 4906, now Public Act 207 of 2024, extending a sales-tax exemption on data center equipment through December 31, 2050.2 A companion bill, Senate Bill 237, did the same for the use tax, and extends the exemption to 2065 for data centers built on brownfields or former power plant sites.3

To qualify, a facility must invest at least $250 million and create and keep at least 30 jobs paying 150% or more of the region’s median wage, and it must be certified by the Michigan Strategic Fund.2 Lawmakers added conditions meant to protect water and electric customers, including requirements to use municipal water and not shift energy costs onto households; critics argued those protections weren’t strong enough.4

Watch the words

Projects aren’t always called “data centers.” You may see “technology campus,” “research computing facility,” “digital infrastructure,” “AI factory,” or “high-performance computing center.” Those can be accurate descriptions, but the questions below apply to all of them. If a building’s main purpose is housing large numbers of computers, it needs the same power, cooling and backup equipment whatever it’s called.

Good first questions to ask

  1. How many megawatts will it draw — at opening, and at full build-out?
  2. Who will own and operate it, and who are the tenants or users?
  3. How will it be cooled, and how much water will it use on a peak summer day?
  4. What backup generators are planned — how many, what fuel, and how often will they be tested?
  5. Will it need a new substation, transmission line or power plant, and who pays for it?
  6. How many permanent jobs, and is that number in a signed agreement?
  7. What tax breaks or public money is it receiving?
  8. Which local, state and federal permits does it need, and when will each be decided?

Example: what this looked like in Ypsilanti Township

The University of Michigan and Los Alamos National Laboratory have proposed a $1.25 billion high-performance computing center on Textile Road: about 100 MW for Los Alamos and 10 MW for University research. The project has been described in official materials as a “research computing facility” rather than a data center, and the estimate of permanent jobs has moved from 800 in a 2024 state memo, to 200 a month later, to 30–50 at a 2026 town hall. See How the Words Changed and Claims and the Record for the documents.


Sources

  1. Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report (December 2024), as summarized by the American Public Power Association and DatacenterDynamics.
  2. House Bill 4906 (2023–24), Public Act 207 of 2024 — bill history; Senate Fiscal Agency analysis of HB 4906 and SB 237 as passed by the Senate. Summary: Ryan LLC, January 28, 2025.
  3. Senate Bill 237 (2023–24), amending the Use Tax Act — bill history. Summary: Sales Tax Institute, January 8, 2025.
  4. “Michigan Approves Tax Breaks for Hyperscale Data Centers,” Government Technology.

Start Here
What is a Data Center?
Just the Facts
Project Links
Who's Who

Recent Posts

  • The Letter That Spoke for Ypsilanti Township
  • Not Yet: What the Regents Are Being Asked to Approve Thursday
  • “LANL Has Made No Commitment of Funds”
  • Four Years of Regents Minutes
  • How the Words Changed

Archives

  • November 2026
  • October 2026
  • September 2026
  • August 2026

Categories

  • Documents & Records
  • Legislation & Advocacy
  • Public Meetings
  • Responses
  • Uncategorized

Privacy Policy • Terms & Acceptable Use

Copyright 2026 — YpsiDatacenter.org. All rights reserved.

Get action alerts

One small, specific task at a time — a call or an email that takes five minutes. Unsubscribe anytime.