Michigan Energy and Data Center Laws
Part of our Michigan resources. The general explainers — What Is a Data Center?, What Is a BESS?, What Is a Substation? and Data Center Siting — apply in any state. This page collects the Michigan laws behind them.
Data center tax exemptions
Michigan began actively courting large data centers in 2024–25.
- House Bill 4906 (Public Act 207 of 2024) — signed January 17, 2025, it extends a sales-tax exemption on data center equipment through December 31, 2050.
- Senate Bill 237 — the companion use-tax exemption, which runs to 2065 for data centers built on brownfields or former power plant sites.
- Senate Fiscal Agency analysis of both bills — to qualify, a facility must invest at least $250 million, create and keep at least 30 jobs paying 150% or more of the region’s median wage, and be certified by the Michigan Strategic Fund. Lawmakers also added conditions meant to protect water and electric customers, including requirements to use municipal water and not shift energy costs onto households.
Energy siting under Public Act 233
- Public Act 233 of 2023 — signed November 28, 2023, it lets developers of large energy projects ask the Michigan Public Service Commission for a siting certificate instead of local zoning approval. For battery storage, it covers sites of 50 MW or more with at least 200 MWh of storage.
- MPSC siting FAQs — a developer can go to the MPSC if a community doesn’t have a “compatible renewable energy ordinance” — local rules no more restrictive than the state’s standards — or if the community has a moratorium, doesn’t decide in time, or denies a project that meets the state standards. Smaller sites remain under local zoning.
- University of Michigan Graham Sustainability Institute — How HB 5120 Works — a plain-language guide for local governments.
What this means for your community: for a large battery project, your township’s ordinance may determine whether the decision stays local. If your township hasn’t looked at its ordinance since 2023, that’s a conversation worth starting now, not after an application arrives.
Substations and transmission lines
- Electric Transmission Line Certification Act (Public Act 30 of 1995) — a “major” transmission line, carrying 345 kV or more and running 5 miles or longer, needs a certificate from the MPSC. The MPSC decides these in contested cases and must issue an order within a year, and residents can participate. Utilities may also choose to seek a certificate for smaller lines.
- Substations — are generally subject to local zoning and site plan review, though the details depend on who owns the facility and what the local ordinance says. If one is proposed, ask your township’s planner or attorney exactly which approvals apply.
Data center electricity cases
- MPSC data center tariffs and contracts — the MPSC has taken up a Consumers Energy data center tariff and DTE’s special contracts for a data center in Saline Township. Its 2025 annual report summarizes the protections it adopted to keep other customers from subsidizing data center costs.
- Intervenors in the Consumers Energy case — the Michigan Environmental Council, NRDC, Sierra Club and the Citizens Utility Board of Michigan intervened to argue for stronger ratepayer and clean energy protections.
Zoning: the lesson of Saline Township
- Saline Township’s exclusionary zoning case — in 2025, Saline Township denied a rezoning for a large data center on farmland. The developer and landowners sued under Michigan’s exclusionary zoning doctrine, arguing the township had no land zoned or planned for industrial use, and the township settled with a consent judgment allowing the project with conditions. The full account and sources are on our siting page.
- Michigan Townships Association data center handout — presents Saline as a cautionary tale for local officials. The lesson: a Michigan community with no place at all for a use like this is legally vulnerable, while one that has planned a reasonable place, with clear standards, is in a much stronger position to say “not here.”