Sources & Links
Everything on this site is built from public documents. This page collects them so you can read the originals rather than take our word for anything.
Where a link goes to the University’s own materials or to a government agency, we have not filtered or summarized it. Read it directly and form your own view.
The project
- U-M × Los Alamos Research Computing Center FAQ — the University’s official project page, from the Office of the Vice President for Research. Covers capacity, water, backup power, jobs, and the town hall schedule. This is the primary source for most of the project’s public claims.
- University Record: Textile Road selected as preferred site — the University’s August 2026 announcement, including its responses to the Township’s security and land use concerns.
- University Record: “Legislative support bolsters U-M, Los Alamos computing facility” — the University’s December 2024 announcement of the state grant. Says Los Alamos “will directly contribute $300 million” and describes the University’s own share as “direct contributions of $220 million.” How that compares with the rest of the record.
- University Record: “A closer look at Los Alamos, U-M research facility” — a February 10, 2026 Q&A in which the project leader said the facility could draw 500,000 gallons of water a day.
- Letter to the Ypsilanti Township community from Los Alamos National Laboratory — full text of the September 2026 letter from LANL Director Thom Mason, distributed in print at the September 9 town hall and published by The University Record on September 10. Addresses nuclear materials, weapons production, the “Tier 1 High Value Target Risk” characterization, security measures, and the economic case. Contains no figures for power, water, jobs, or cost.
- Los Alamos National Laboratory — the federal laboratory that would occupy the larger of the two buildings. Operated for the National Nuclear Security Administration within the U.S. Department of Energy.
Local government
- Ypsilanti Township: Data Center Information — the Township’s own archive, with its resolutions, correspondence, and a dated timeline. The best single source for what the Township has actually done. Start here if you want the local record.
- Ypsilanti Community Utilities Authority (YCUA) — the water and sewer authority governed jointly by Ypsilanti Township and the City of Ypsilanti. YCUA purchases water from the Great Lakes Water Authority and serves roughly 151,000 water customers. In April 2026 its board voted a twelve-month moratorium on service to data centers and AI computing facilities. Board meeting agendas and minutes are posted here.
- City of Ypsilanti: YCUA board — the City appoints two members to the YCUA board. Useful if you want to know who decides on utility service.
- YCUA Resolution 26-08 (PDF) — the utility authority’s twelve-month moratorium on service to data centers and AI computing facilities. YCUA also keeps a data center information page.
Township resolutions
- Resolution 2025-23, August 19, 2025 (PDF) — the Township’s first formal opposition. Asks the University and Los Alamos to “cease and desist” at Bridge and Textile Roads and to build instead on the former General Motors Hydramatic property at Willow Run.
- Resolution 2025-42, December 2, 2025 (PDF) — asks the MEDC and the Michigan Strategic Fund to cancel or claw back the $100 million grant, citing what it calls “numerous material misrepresentations” by the University.
- Resolution 2026-05 (PDF) — opposes the facility “anywhere within the boundaries of Ypsilanti Township,” Willow Run included, on the ground that it would be a “Tier I High Value Target Risk.” It replaces the relocation request in 2025-23. The Clerk’s certification dates it to a special meeting on March 31, 2026. (What the record says about that label.)
- Resolution 2026-08, April 15, 2026 (PDF) — asks YCUA for “a moratorium of not less than 12 months” on water and sewer service for data centers, AI computing facilities and high-performance computational centers.
- Resolution 2026-26, October 6, 2026 (in the board packet, PDF) — demands a halt to ground-disturbing work until archaeological and cemetery investigations are done, after the State Historic Preservation Office told the University a recorded cemetery boundary overlaps the property. My summary is here.
The Township’s 180-day moratorium on large utility structures was reported in August 2026 (see the news coverage below). I haven’t found the text posted online yet.
The state record
- Michigan Strategic Fund Board Packet, December 2024 (PDF) — the single most informative document about this project. Pages 52–65 contain the University’s $100 million grant application, an itemized $1.25 billion budget, the 100 MW / 10 MW capacity split between Los Alamos and the University, substation and water details, job projections, and the approving resolution. Much of what the public materials omit is here.
- MSF board packet archive — all board packets. Grant recipients file annual progress reports that the MSF transmits to the Legislature.
- MEDC commitment letter to the University of Michigan, October 27, 2023 (PDF) — from MEDC CEO Quentin L. Messer, Jr. to then-president Santa Ono, committing up to $400 million in state support through bonding and other programs for a Department of Energy supercomputing national laboratory led by Los Alamos, to be located on the campus of the American Center for Mobility. Conditioned on job creation, investment, federal re-investment, industry and state access to non-classified areas, and a minimum 25% match from the University. The earliest document we have seen on this project. Our analysis is here.
- MEDC FOIA release, request 1068 (73 pages) — the signed Memorandum of Understanding between Los Alamos National Laboratory and the Regents of the University of Michigan, dated November 26, 2024; the University’s Strategic Site Readiness Program application materials; an economic impact analysis; and correspondence between U-M and MEDC staff. Contains the 100MW/10MW capacity split, the original state funding ask, operating cost estimates, and the stated reasons Michigan was selected. Published by MEDC in its public FOIA request archive.
- MEDC FOIA request archive — browse or search all published MEDC records releases, and file your own request.
- MEDC announcement of the grant — December 10, 2024.
- Michigan Legislature — look up current data center legislation and find your own state representative and senator. Bill numbers change between sessions, so check status before citing anything.
- Michigan Public Service Commission — regulates DTE. Substation cost allocation, large-load rates, and interconnection are decided here, and case filings and public comment opportunities are posted publicly. This process is not affected by the University’s zoning exemption.
- Michigan EGLE — state environmental permitting: air permits for backup generators, stormwater, wetlands, and water withdrawal. Permit applications carry mandatory public comment periods, and these also apply regardless of local zoning.
- Rep. Debbie Dingell, letter to Ypsilanti Township (PDF) — September 15, 2026, addressed to Supervisor Stumbo and the community, copied to U-M President Domenico Grasso. States her opposition to the Textile Road site; raises the EPA CERCLA record for the site; reports that her inquiries found no federal appropriation or binding federal commitment behind the $300 million attributed to Los Alamos; and sets out proposed federal and state standards for data center development. Our summary is here.
- HB 6264 — Data Center Energy Standards Act — would require data centers to procure clean or renewable energy equal to 100% of annual use by January 1, 2040, enforced by the Attorney General. Introduced by members of the Washtenaw delegation. Our analysis of the text, including the additionality gap and the 2040 deadline, is on that page.
Primary documents, 2023–2025
Records obtained through Freedom of Information Act requests, covering the period from March 2023 — earlier than anything the project has published — through December 2025. These are the agreements, board materials and modelling behind the decisions.
Agreements
- NDA RSNDA-23-0076 (March 2023) — the earliest document in the record. States the purpose as discussions relating to a high performance computing facility and office building in support of the Advanced Simulation & Computing Program and Weapons Physics Directorate. Lists electrical power transmission, facility cooling technology capacity and supercomputer power forecasts as subjects of agreed exchange. A restricted, by-name agreement whose existence was itself to be protected.
- First Amendment, NDA-23-0173 (July 2023) — adds SmithGroup, Inc. and The American Center for Mobility. Describes SmithGroup’s conceptual design package covering architecture, mechanical, electrical, structural, civil, fire protection, IT, DOE security risk assessment and cost estimating.
- U-M / Willow Run Arsenal of Democracy Landholdings NDA (May 2024) — confidentiality agreement concerning Project L and “a potential real estate transaction.”
- MEDC confidentiality agreement (May 2024) — the University signs MEDC’s standard business confidentiality form. Exhibit A designates as FOIA-exempt, among other things, “utility, water, wastewater, and gas usage needs and projected rates” and “environmental studies.” A negotiated paragraph preserves the University’s own FOIA obligations.
- Memorandum of Understanding #204 (November 2024) — the full signed MOU between Los Alamos and the Regents. Commits to “mutual support of UM’s Innovation Campus in Ann Arbor” and a computing centre “near UM’s Ann Arbor campus.” States that, subject to NNSA funds, approximately 200 LANL jobs will be created at UM over ten years. Names quarterly collaboration managers and annual reviews. Obligates no funds.
- NDA termination and transition letter (2025) — records that the American Center for Mobility is no longer collaborating and has returned or destroyed the information it held. Moves remaining obligations into MOU #204.
- Nexus Gas Transmission confidentiality agreement (December 2025) — confirms a high pressure natural gas pipeline on the property, and that the University entered discussions to “evaluate construction conditions” three months before closing on the land.
“Project L” — state board materials
The project was handled under the codename Project L until shortly before the public vote.
- Project L briefing memo, October 2024 — requests $135 million and projects over 800 direct permanent jobs over ten years. Itemises the $400 million state package: $135M SSRP, $135M state bonding requiring legislation, $30M capital outlay, $100M budget office ask.
- Project L draft term sheet, October 2024 — would have required a fully executed lease of no fewer than ten years for the National Lab Building. The executed version requires only “a multi-year term.”
- Fiscal impact estimates, November 8, 2024 — the modelling behind the economic claims. States the industry modelled as NAICS 541511, Custom Computer Programming Services, producing a job multiplier of 3.25 and 650 average total jobs. Net return to the state of 0.25 over twenty years. No local revenue line.
- Circulation email, October 16, 2024 — shows the October materials were briefed to subcommittees before reaching the full board.
- December 2024 board packet (full, 136 pages) · agenda · transmittal email · budget summary — the materials as they went to the board four days before the vote. In this compilation the University’s memo appears at pages 43–44.
- Ann Arbor SPARK letter of support, December 2024 — the documented basis for the “local support” criterion. Signed by Paul Krutko, who writes that SPARK “was proud to provide key assistance in the site selection process.” The board list on the letterhead includes a University of Michigan officer as chair, U-M’s vice president for government relations, and Ypsilanti Township’s supervisor. No letter from Ypsilanti Township appears in the packet.
- Ann Arbor SPARK announcement, December 5, 2024 — SPARK’s public announcement of the facility, five days before the Michigan Strategic Fund vote.
MEDC records releases
Responses to Freedom of Information Act requests made to the Michigan Economic Development Corporation, released April 2026.
- Release R000125 — the most useful of the set. Contains MSF Resolution 2024-176 and the executed term sheet; the State Budget Office legislative transfer letter moving $100 million into the program on the morning of the vote; and a July 2025 email in which State Senator Jeff Irwin, asked by Ypsilanti Township to obtain the project documents, is forwarded to MEDC communications staff with the note “let’s discuss our approach.”
- Release R000127 — largely overlapping, produced by a different MEDC custodian. Adds the internal email circulating the transfer letter on December 10, 2024.
- Release R000129 — the recusal letter from Dr. Britany Affolter-Caine, who stepped back from the vote and the discussion because her organization includes the University.
- Release R000131 — a March 2025 email chain in which U-M’s Steven Ceccio, Kelly Sexton, William Foss and Karthik Duraisamy draft language about the U-M/Los Alamos partnership for the State’s “Michigan Stargate Proposal.” Forwarding it to MEDC colleagues, the State’s Chief Innovation Ecosystem Officer, Ben Marchionna, writes that “we should highlight the UM-LANL relationship and not explicitly say that’s our strategy.”
- Release R000132 (73 pages) — September and October 2024 emails between U-M’s Drew Smith and MEDC staff over the “Project L 2-pager,” and the November 27, 2024 email sending MEDC the executed MOU. Includes the University’s statement that “A Phase I Environmental Site Assessment was conducted that identified recognized environmental conditions. Therefore, a Phase II assessment is planned.”
Toolkits for other communities
These are organizing and policy resources — practical material for communities facing a data center proposal, as distinct from the research further down this page. Recommended by the Centering Justice community. I haven’t worked through all of them yet, so the descriptions below are the publishers’ own framing rather than my assessment.
- Environmental Protection Network — Data Center Resources for Communities — capacity-building resources for communities.
- Climate XChange — State Policy Toolkits for Data Center Regulation — state-level policy approaches.
- AI Now Institute — Data Center Industry Mapping — a working draft mapping the industry’s players, with community resources.
- Earthjustice — The AI Gas Rush: Risks and Implications of Bring Your Own Power — on data centers generating their own electricity on site. Note that our project has said on the record it does not plan to.
- NAACP and CEEJH — The People’s Report — a community counter-report to an official task force’s findings on data center infrastructure in Prince George’s County, Maryland.
Everything on this site is free for anyone to use. If something here helps your community, take it.
Research and analysis
Studies and data on what data centers actually do — energy, water, jobs, ratepayer effects. Where the toolkits above are about organizing, these are about evidence.
- Michigan local government leaders’ views on large-scale data center development (PDF) — Michigan Public Policy Survey, Center for Local, State, and Urban Policy, Ford School of Public Policy, September 2026. Statewide survey of officials in 1,328 jurisdictions, conducted March–June 2026. Fresh water is the leading concern (60% expect negative impact, 5% expect none); 57% expect harm to ratepayer utility bills; 55% say their residents would strongly oppose a local data center against 2% who would support; 60% oppose the State taking planning and zoning decisions; 51% expect positive impact on construction jobs but only 24% on long-term local jobs. Our summary is here.
- “What Happens When Data Centers Come to Town?” (PDF) — July 2025 policy brief by Terry Nguyen and Ben Green, Science, Technology and Public Policy Program at the University of Michigan’s Ford School of Public Policy, with the Michigan Environmental Justice Coalition. Covers utility rate impacts, tax revenue, employment, and cooling trade-offs, and recommends policies including energy audits, renewable additionality, public reporting, and protection against ratepayer cost-shifting. Note: the brief contains a unit error in its energy figures, confusing megawatts with megawatt-hours. Rely on its policy analysis rather than those numbers.
- 2024 United States Data Center Energy Usage Report (PDF) — Lawrence Berkeley National Laboratory for the U.S. Department of Energy. The authoritative source for national data center electricity consumption. A 2025 update projects consumption through 2030.
- Uptime Institute Global Data Center Survey 2025 (PDF) — survey of more than 800 operators. Industry data on power usage effectiveness, rack densities, water metric reporting, and outage causes.
- Brookings Institution: New evidence on data center employment effects — independent analysis of what data centers actually do to local employment.
- Hamm Institute for American Energy: Data Center Employment Forecast Analysis (PDF) — November 2025. Staffing ratios per megawatt for both construction and operations.
- U.S. Energy Information Administration: household electricity use — the baseline for any “equivalent to X homes” comparison, including ours.
Backup generators and emissions
- EPA: Understanding the Stationary Engines Rules — how emergency generators are regulated, including the annual hour allowance for readiness testing.
- 40 CFR Part 63, Subpart ZZZZ — the federal rule text itself.
- Cummins on alternative fuel emissions and Caterpillar on renewable liquid fuels — the engine manufacturers’ own data on hydrotreated vegetable oil, including the distinction between lifecycle carbon reduction and local pollutants such as NOx.
Environmental records
Rep. Dingell’s September 2026 letter identifies an EPA record under the Comprehensive Environmental Response, Compensation, and Liability Act for the Textile Road Site. According to the letter, cleanup work was completed and the site is now in an oversight and management phase. These are the databases where the current status can be checked.
- EPA ECHO detailed facility report — the federal enforcement and compliance record referenced in Rep. Dingell’s letter. The letter cites EPA ID MID980825558 for the Textile Road Site, noting its proximity to the former General Motors Willow Run plant.
- EGLE RIDE Mapper — Michigan’s map of contaminated and regulated sites, including Superfund sites, properties regulated under Parts 201 and 213, and land or resource use restrictions. Searchable by address.
- Baseline Environmental Assessment, 10221 Textile Road (PDF, 328 pages) — prepared by Apex Companies for the Regents and filed with EGLE in January 2025, for the roughly 20-acre parcel the University bought in November 2024. Obtained from EGLE under the Freedom of Information Act.
- Baseline Environmental Assessment, 10455 and 10635 Textile Road (PDF, 317 pages) — filed with EGLE in March 2026 for the rest of the site. Includes Apex’s Phase I Environmental Site Assessment Update, dated March 3, 2026, and laboratory sampling results. My summary of both assessments is here.
- EGLE Master Data Forms, October 1, 2026 — 10221 Textile (PDF) · 10635 Textile (PDF). The State’s own site records. Both locations are listed as Part 201 sites, and the 10221 form lists lead, mercury, other metals and petroleum compounds among the contaminants of concern.
- Phase I and Phase II Environmental Site Assessments — the University told the Michigan Strategic Fund in December 2024 that a Phase I had identified recognized environmental conditions at the site and that a Phase II was therefore planned. The March 2026 assessment above includes a Phase I update. We haven’t seen a separate Phase II report, and we have asked for it. Correction, November 24, 2026: This entry used to say neither report had been released. That was wrong. The Phase I update is part of the March 2026 assessment EGLE released, which has been on this site since September 30.
Congressional correspondence
- Rep. Dingell to President Grasso and Director Mason, June 24, 2026 (PDF) — “I once again urge the University of Michigan and Los Alamos to hold a real public townhall with community dialogue where community concerns are specifically addressed.”
- The University’s reply, July 10, 2026 (PDF) — answers her questions about nuclear weapons and says “no final site has been selected.” The University had closed on the Textile Road land that March.
- Rep. Debbie Dingell to President Grasso, September 16, 2026 (PDF) — sixteen questions about the LANL agreement, its legal status, and the $300 million attributed to Los Alamos.
- President Grasso’s reply, October 8, 2026 (PDF) — the University’s answers. Confirms “LANL has made no commitment of funds,” that the facility is not in the NNSA’s out-year budget profile, that federal funding requires the building to be substantially complete first, and that U-M carries any cost overruns. My analysis is here.
- Rep. Dingell to Ypsilanti Township, September 15, 2026 (PDF) — opposing the Textile Road site. My summary.
Board of Regents
- Request for Action: Research Computing Center, November 2026 (PDF) — what the Regents approved on November 19, 2026. Phase I is about 150,000 square feet at an estimated $450 million, and Phases I and II together are “not-to-exceed $785,000,000.” Phase I is to be paid for with the State grant and University bonds, “with debt service paid from a combination of rental payments and general fund resources.” Construction of Phase I is scheduled to finish in fall 2031. The attached Community Partnership and Investment Resolution has University leadership present a community program framework to the Regents by March 31, 2027. The copy I posted before the vote · my response to it.
- Board of Regents meeting, November 19, 2026 (video) — the meeting where the project was approved.
- Regents meeting minutes — the official archive. I read four years of them, and here’s what’s in there.
Town halls and public meetings
The University has held two community town halls in Ypsilanti Township, both recorded and public. The same panel appeared at each. Before those, it held a student town hall online in April, and the Township has held its own public meetings since.
- Student town hall, April 21, 2026 — an online webinar organized by student sustainability groups with the Office of Campus Sustainability. The panel included Steve Ceccio, Karthik Duraisamy, Chris Kolb and Sarah Mills. It covers the 5–10 MW / 50–100 MW split and the University’s position on payments in lieu of taxes.
- September 9, 2026 — nearly three hours, at the Marriott at Eagle Crest. Includes the confirmation of the roughly 90/10 capacity split, the answer on whether jobs would go to township residents, and the exchange on the gas pipeline. My account, with every quotation linked to its timestamp, is here.
- October 1, 2026 — the second community town hall. My account is here.
- Ypsilanti Township Board of Trustees, October 6, 2026 — the meeting that adopted Resolution 2026-26, with the State Historic Preservation Office correspondence read into the record. My summary.
- Ypsilanti Township panel discussion, November 19, 2026 — held at the EMU Student Center the evening of the Regents’ vote. The Township’s announcement. The Detroit News covered it.
Mailings
Everything that’s come through our mailboxes about this project, in the order it arrived. These are scans of the actual pieces, both sides. Where a card had a personal address on it, I’ve blacked it out.
- University of Michigan postcard, “Powering Research. Advancing Michigan.” (July 2026) — says “A final site has not been selected. Two Ypsilanti Township locations are currently being evaluated,” with maps of the Willow Run complex and the Textile Road site. The University had already closed on the Textile Road land that March. Names Los Alamos, credits “U-M’s $1.25 billion in funding,” and lists what the facility “Will Not” do, including “Manufacture weapons or house nuclear materials.” Arrived in July, a month before the University announced Textile Road as its preferred site.
- University of Michigan postcard, “Learn More at a Community Town Hall” (September 2026) — mailed ahead of the September 9 town hall. Announces the “144-acre site at Textile and Bridge Roads” as the preferred location, and lists the University’s “Responsible Neighbor” commitments on the back. Los Alamos isn’t mentioned on either side.
- Ypsilanti Township data center newsletter (September 2026) — eight pages from the Township’s Office of Community Engagement, sent after the University’s August 11 announcement. It opens with a letter to residents, lays out the Township’s own timeline going back to the November 2024 Zoom meeting, covers Resolutions 2026-05 (opposing the project) and 2026-08 (asking YCUA for a moratorium), reprints the December 2024 MEDC memo with the project budget, and lists contact information for all eight Regents. The back cover announces the September 9 town hall and says the October meeting date was still “to be announced,” so it was put together before that date was set. Exact mailing date unconfirmed.
- University of Michigan postcard (October 2026) — one side on cancer surgery, the other calling the project “an academic research center.” Los Alamos appears once. My write-up is here.
- University of Michigan mailer, “Research Computing Center: Advancing Scientific Discovery in Michigan” (received November 7, 2026) — a fold-out brochure. Names Los Alamos, says the facility “would not involve nuclear weapons manufacturing, physical weapons testing or the storage of hazardous nuclear materials,” and includes a project timeline going back to May 2024.
- Ypsilanti Township postcard, “Save the Date! Data Center Panel Discussion” (received November 7, 2026) — the Township’s invitation to its November 19 panel at the EMU Student Center Ballroom. Seating for 500, no registration required.
- University of Michigan postcard, “The University of Michigan Research Computing Center” (late November 2026) — arrived after the Regents’ vote. A “What it is / What it isn’t” card: “NOT a Commercial Data Center,” “90% less energy than a data center,” and 80% of “the 124-acre property” preserved as green space. The September card said 144 acres. Los Alamos isn’t named anywhere on it.
- “Michigan Opinions Survey” (November 2026) — not a mailing, but it reached residents’ phones by text message, so it belongs here. Screenshots of a survey hosted at research-opinions.com. It asks whether you support the University building the facility, then tests whether a series of statements make you “less opposed.” Among them: the facility “will house no military or nuclear material,” its national security research “will focus on cyber security and improving practices to safely manage America’s existing nuclear material,” and it will have “no investment from big tech companies, venture capital, or private business.” None of these screens says who’s behind it.
Missing any? A job summary released through FOIA shows the University’s communications office paid for “design, production and mailing of 4 postcard mailers from June – October” 2026. Three from that window are listed above. If you received a U-M mailing about this project between June and August that isn’t here, I’d love a photo or scan of both sides.
News coverage
- WDET 101.9 FM — on the Township’s 180-day moratorium on major electrical infrastructure, the October 2024 and June 2025 land purchases, and July 2025 as the point at which officials say they learned the full scope of the project.
- Planet Detroit — coverage of the September 9 town hall, including U-M’s acknowledgement of anger and distrust in the community.
- Planet Detroit — on the land purchase and how the Township was notified.
- The Michigan Daily — on the closing of the Textile Road purchase.
- The Eastern Echo — on the Township’s resolutions opposing the project.
- Crain’s Detroit Business — August 2026, on the Township’s moratorium on large utility structures.
- The Sun Times News — November 18, 2026, the day before the vote. University officials put water use at as much as 650,000 gallons a day.
- MLive — November 19, 2026, on the Regents’ approval of a maximum $785 million budget.
Links verified August 28, 2026; page updated November 24, 2026. If one has broken or a document has moved, tell us and we will fix it. If you know of a public document about this project that belongs on this page, send it along — including one that cuts against our position.